Description |
The project will consist of the installation of approximately 1,975 SF of concrete sidewalk, 295 SF of concrete sidewalk ramp with truncated domes, 463 SF of concrete residential driveway apron, 337 LF of concrete curb & gutter, 1 connection to existing concrete manhole and asphalt paving. |