The Project Will Consist of The Installation of Approximately 1,292 LF Of 8” Water Pipe And Fittings, 31 Potable Water Service Connections, 2 Fire Hydrants, 11,912 SF of Sidewalks, 3,147 LF of Curb And Gutter, 4,327 SF of Sidewalk Ramps with Truncated Domes, 6,003 Concrete Residential Driveway Aprons, 1,106 SF of Concrete Driveways, 1,211 SF of Concrete Raised Crosswalks, 903 SF of Retaining Wall And Footings, 304 SF of Monolithic Retaining Walls, Removing and Reconstructing Stairs, Connecting 45 Existing Storm Drain Pipes Through Curbs, 2 48” Storm Drain Manholes, 492 LF 12” Storm Drain Pipe and Connecting 5 Existing Storm Drains To New Storm Drain. To download Bid Documents and Construction Drawings, please click below on "Related Documents"
|
|
5/11/2023 9:00 AM
|
|
Open Until Contracted
|
|
05/25/2023 (3:05PM)
|
|
05/22/2023; 05/24/2023
|
|
05/18/2023 (11:00 AM)
|
|
Levi Huntley lhuntley@grantspassoregon.gov 541-450-6110
|
|
Documents and Drawings may be picked up at the City of Grants Pass Community Development Office or downloaded by clicking on "Related Documents" below.
|
|
If you have downloaded the plans and documents and would like to be placed on the plan center or plan holders list, please contact Megan Smith at (541) 450-6078 or msmith@grantspassoregon.gov
|
|
Temporary Features and Appurtenances, Road Work, Drainage & Sewers, Bases, Wearing Surfaces, Permanent Traffic Safety And Guidance Systems, Right of Way Development & Control, and Water Supply Systems.
|
|
Work on 10th St MUST BE COMPLETED BY AUGUST 25th, 2023, prior to school starting.
|
|
|
|